Report: AZ ranks 2nd nationally in solar power installation - WTVM.com-Columbus, GA News Weather & Sports

Report: AZ ranks 2nd nationally in solar power installation

Posted: Updated:
CBS 5 CBS 5
  • NEWSMore>>

  • Wrong way motorcyclist recovering after high speed chase

    Wrong way motorcyclist recovering after high speed chase

    Friday, April 18 2014 12:47 PM EDT2014-04-18 16:47:22 GMT
    A MOTORCYCLIST CRASHED AFTER A HIGH SPEED CHASE WITH AUTHORITIES IN EAST ALABAMA, ACCORDING TO THE LEE COUNTY SHERIFF. OFFICIALS SAY THE CHASE BEGAN WHEN THE MOTORCYCLIST WAS SPEEDING AND DEPUTIES ATTEMPTEDMore >>

    A motorcyclist crashed after a high speed chase with authorities in East Alabama, according to the Lee County sheriff.More >>

  • MCoE Chief of Armor reassigned to Fort Bliss

    MCoE Chief of Armor reassigned to Fort Bliss

    Friday, April 18 2014 11:54 AM EDT2014-04-18 15:54:14 GMT
    The Maneuver Center of Excellence announced Friday, April 18, that their chief of Armor and commandant of the Armor School, Brig. Gen. Leopoldo A. Quintas, has been reassigned to Fort Bliss, Texas.  QuintasMore >>
    The Maneuver Center of Excellence announced Friday, April 18, that their chief of Armor and commandant of the Armor School, Brig. Gen. Leopoldo A. Quintas, has been reassigned to Fort Bliss, Texas.  QuintasMore >>
  • Voter registration deadline is April 21

    Voter registration deadline is April 21

    Friday, April 18 2014 9:24 AM EDT2014-04-18 13:24:06 GMT
    The deadline for voters to register is quickly approaching. Georgia Secretary of State Brian Kemp is reminding voters that April 21 is the last day to register for the May 20 primary.More >>
    The deadline for voters to register is quickly approaching. Georgia Secretary of State Brian Kemp is reminding voters that April 21 is the last day to register for the May 20 primary.More >>
PHOENIX (CBS5) -

Arizona ranks second nationally in solar installation, according to a newly-released report.

The 2012 U.S. Solar Market Insight Report from the Solar Energy Industries Association also shows more utility-scale solar technology was installed in Arizona over the last year than in any other state.

The annual SEIA report shows am increase in photovoltaic system installations in the state, growing from 273 megawatts worth of power installed in 2011 to 710 megawatts in 2012.

Arizona now has edged out New Jersey for the number two slot, and trails only California in solar production, the report stated.

Nationally, solar installation grew by 76 percent over the last year.

The major utility-scale projects are under way in Arizona. Agua Caliente Solar, near Yuma, is currently generating 250 megawatts. When completed in 2014, it will be the largest solar photovoltaic (PV) project in the world at 290 megawatts.

Mesquite Solar PV complex, west of Phoenix, is expected to generate 150 megawatts by later this year, and could expand to 700 megawatts upon completion.

Solana Generating Station, near Gila Bend, will be completed in 2013. Once fully operational, the 280-megawatt project will be one of the largest concentrating solar power systems in the world.

Copyright 2013 CBS 5 (KPHO Broadcasting Corporation). All rights reserved.

Powered by WorldNow

1909 Wynnton Road
Columbus, Ga. 31906

FCC Public File
publicfile@wtvm.com
706-494-5400
EEO Report
Closed Captioning

All content © Copyright 2000 - 2014 Worldnow and WTVM. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.